A graphic design project can take up to 2 weeks to complete. You can expect a rough draft within the first week. If this is a rush request, it is MMT’s prerogative to reduce the number of possible revisions.
A video project can take up to 2 weeks to complete. You can expect a rough cut within the first week. If this is a rush request, it is MMT’s prerogative to reduce the number of possible revisions
The turnaround time for print products varies based on a format (a postcard can be produced quicker than a t-shirt, for instance). It is always a good idea to plan on having a minimum of 4 weeks of production time for the actual product after approval of the final design. If this is a rush request, it is MMT’s prerogative to reduce the number of possible revisions.)